![]() |
Sod arriving, it took 2 truckloads |
![]() |
The sod was laid with a tracked machine. The turf was also planked to reduce tracking |
![]() |
The sod came in large rolls |
![]() |
The seams were pulled tightly together |
![]() |
6 green completed |
![]() |
We added sand in the seams and washed it in |
![]() |
Installing the collar |
![]() |
Rolling the collar and green |
![]() |
Completed green |
No comments:
Post a Comment