![]() |
| Sod arriving, it took 2 truckloads |
![]() |
| The sod was laid with a tracked machine. The turf was also planked to reduce tracking |
![]() |
| The sod came in large rolls |
![]() |
| The seams were pulled tightly together |
![]() |
| 6 green completed |
![]() |
| We added sand in the seams and washed it in |
![]() |
| Installing the collar |
![]() |
| Rolling the collar and green |
![]() |
| Completed green |












No comments:
Post a Comment