The new greens are progressing very well. We should be on track for an opening around May 15th. We have mowed them 6 times and are now going to an every other day mowing schedule. We have also hydrojected them 2 times and which aerates and smooths them out. Yesterday day we sanded and aerated them with 1/4 tines and then rolled them again. The current height of cut is 0.235. By the summer they should be around 0.140.
|
The sod has rooted in about 1.5 inches so far. |
|
We topdressed the green first so we would not make ruts on the green |
|
An added advantage of sanding first is that a good portion of the sand vibrates into the holes which results in much less dragging. |
No comments:
Post a Comment