Laying Sod 5 and 6 green

The sod has been installed on 5 and 6 green. The process went very smooth the 5 man crew laid greens, collars and approaches on those holes in about 10 hours.
Sod arriving, it took 2 truckloads
The sod was laid with a tracked machine.  The turf was also planked to reduce tracking
The sod came in large rolls
The seams were pulled tightly together
6 green completed
We added sand in the seams and washed it in
Installing the collar
Rolling the collar and green
Completed green